🛡️Shared & outdoor space planner

Gatehouse / security post

Connect light points, cooling, networking, security and automation in one space-level schedule.

Connected room schedule

What to plan before finishes

💡

Power & lighting

Count every light point, socket, AC position and dedicated heavy-load circuit instead of applying one generic room allowance.

Model the electrical load →
📶

Connectivity

Decide whether this space needs an access point, wired TV/workstation point, intercom, camera or automation hub connection.

Plan Wi-Fi coverage →

Automation

Group lighting circuits, local switches, climate, curtains, presence and safety sensing around daily routines.

Calculate controls →
People also plan

Related spaces

🚶🏾

Corridor / hallway

3 lights · 0 AC · 1 sensor

Plan space →
🪜

Staircase

3 lights · 0 AC · 1 sensor

Plan space →
🌤️

Balcony / veranda

2 lights · 0 AC · 1 sensor

Plan space →
🌿

Compound / garden

6 lights · 0 AC · 2 sensor

Plan space →