πŸ’ΌComplete property planning

Office

Business continuity infrastructure for staff, cloud work, security and managed connectivity.

Property-specific risks

Design around the building’s real constraints.

01

User-density peaks

Capture this during the preliminary plan and verify it during the engineering survey.

02

Printer and server loads

Capture this during the preliminary plan and verify it during the engineering survey.

03

Internet failover

Capture this during the preliminary plan and verify it during the engineering survey.

Typical spaces

Build the property room by room

🏒

Office / workstation area

6 suggested light points

Plan space β†’
πŸ›ŽοΈ

Reception / lobby

6 suggested light points

Plan space β†’
🚢🏾

Corridor / hallway

3 suggested light points

Plan space β†’
πŸš—

Parking / carport

4 suggested light points

Plan space β†’